Key facts
- Manuals
- 1
- Languages
- EN
- Last added
- 2023-10-20
Featured Walinga manuals

Walinga AL 1314/1618/2224 Drop-Through Rotary Airlocks Operator's Manual
This document is the Operator's Manual for Walinga drop-through rotary airlocks, specifically models AL 1314, AL 1618, and AL 2224. It details the operating principles, key guidelines such as direction of rotation and tip clearances, and provides instructions for scheduled maintenance.
Covers: Introduction · Key Operating Guidelines · Scheduled Maintenance · Troubleshooting · Airlock Maintenance · Rotary Airlock Components
Latest Walinga manuals
Walinga AL 1314/1618/2224 Drop-Through Rotary Airlocks Operator's Manual
User Manual 18 pages · 2.5 MB · ENOperator's manual for Walinga AL 1314, AL 1618, and AL 2224 drop-through rotary airlocks covering operation, maintenance, and troubleshooting.
Which document do I need?
User Manual
Day-to-day operation, settings and troubleshooting. Start here if the product is already set up.
Questions answered in Walinga manuals
Which direction must the airlock rotor move?
The airlock rotor MUST MOVE COUNTER - CLOCKWISE WHEN VIEWED FROM THE DRIVEN END.
From: Walinga AL 1314/1618/2224 Drop-Through Rotary Airlocks Operator's Manual
What is the preferred tip clearance for Model 2224?
The preferred tip clearance for Model 2224 is 0.009.
From: Walinga AL 1314/1618/2224 Drop-Through Rotary Airlocks Operator's Manual
