This manual describes the use and installation of AXF magnetic flowmeters.
This document serves as the hardware user's manual for the Yokogawa AXF series magnetic flowmeters, covering both integral flowmeter and remote flowtube configurations. It provides essential guidance on safe handling, installation procedures for various nominal diameters, and wiring connections for power and output cables.
The manual also details maintenance tasks such as electrode replacement, fuse replacement, and display unit replacement. Additionally, it includes specific instructions for explosion-protected type instruments and troubleshooting steps for common issues like unstable zero or disagreement between indication and actual flow.
| Document Revision | 7th Edition: June 2006 |
|---|---|
| Document Number | IM 01E20D01-01E |
Installation and wiring must be performed by an expert engineer or skilled personnel.
The power must be off for at least 10 minutes before opening the cover.
It should be moved using a trolley with at least two people carrying it.