LCPtracker Procedure Manual for NDDOT Staff

This is a procedure manual for NDDOT staff on how to operate LCPtracker system


LCPtracker Procedure Manual for NDDOT Staff - cover page
Brand
NDDOT
Category
Other
Document type
User Manual
Language
English
Pages
66
File format
PDF
File size
6 MB
Published
18 October, 2023
Updated
18 October, 2023
MD5 checksum
7989DB63D7215C4BB931F6E91DD2850E

About this manual

This document serves as a procedural guide for North Dakota Department of Transportation (NDDOT) staff using the LCPtracker software. It outlines the roles of administrative users, project engineers, and business managers within the system. The guide covers the entire workflow from setting up new projects and assigning contractors to inputting wage decisions and reviewing payroll data.

What's inside

  • Administrative Users
  • Setting Up Projects
  • Setting up and Assigning Contractors
  • District Users and Role Assignment
  • Clearing Violations
  • Reviewing Payroll
  • Labor Interviews
  • Reports
  • Finalizing and Closing Project Files
  • Inputting Wage Decisions

Frequently asked questions

Who can designate another Full Admin?

Only a Full Admin may designate another Full Admin.

What is the Prevailing Wage Lock-In Date?

The Prevailing Wage Lock-In Date is the bid letting date of the contract.

How are OJT rates determined?

OJT rates are determined by calculating 80% of the journeyman rate.

Download PDF (6 MB)