Geosynthetic Reinforced Soil Integrated Bridge System Interim Implementation Guide

This document provides an interim implementation guide for GRS Integrated Bridge System


Geosynthetic Reinforced Soil Integrated Bridge System Interim Implementation Guide - cover page
Brand
Federal Highway Administration
Category
Other
Document type
User Manual
Language
English
Pages
163
File format
PDF
File size
8.8 MB
Published
18 October, 2023
Updated
18 October, 2023
MD5 checksum
BA537F92C1EDE00EB966E7BAB476146D

About this manual

This manual serves as the first in a two-part series providing step-by-step guidance for designing and constructing Geosynthetic Reinforced Soil (GRS) technology for the Integrated Bridge System (IBS). It is intended for engineers seeking background knowledge and recommended practices for this alternative construction method. The document covers the system's components, including a reinforced soil foundation, GRS abutment, and GRS integrated approach.

What's inside

  • Introduction
  • Benefits of GRS-IBS
  • Notation and Terminology
  • Materials
  • Design Methodology
  • Hydraulic and Seismic Conditions
  • In-Service Performance
  • Construction
  • Inspection and Maintenance
  • Quality Control

Specifications

Report NumberFHWA-HRT-11-026
Publication DateJanuary 2011
Number of Pages169

Frequently asked questions

What is the primary application of GRS-IBS?

The technology is selected for small, single-span structures meeting the criteria described in the manual.

What design formats are provided in the manual?

The manual provides analytical and empirical design methodologies in both Allowable Stress Design (ASD) and Load and Resistance Factor Design (LRFD) formats.

Does the manual cover maintenance procedures?

Yes, the manual presents detailed construction guidance along with methods for the inspection, performance monitoring, maintenance, and repair of GRS-IBS.

Download PDF (8.8 MB)

More Federal Highway Administration Manuals


View all Federal Highway Administration manuals →