Geotech Explosion Proof Control Module for Water Table Depression Pump™ Installation and Operation Manual

This manual introduces the function and theory of Water Table Depression Pump ™ Explosion Proof Control Module, as well as system components, installation, operation, maintenance, troubleshooting, specifications, system diagram and replacement parts list.


Geotech Explosion Proof Control Module for Water Table Depression Pump™ Installation and Operation Manual - cover page
Brand
Geotech Environmental Equipment Inc.
Category
Professional medical equipment
Document type
User Manual
Language
English
Pages
36
File format
PDF
File size
2.2 MB
Published
18 October, 2023
Updated
18 October, 2023
MD5 checksum
966AC63F5D98E1A60F5E5DD5B2FBB7C5

About this manual

This manual provides step-by-step instructions for installing, operating, and maintaining the Explosion Proof Control Module for Water Table Depression Pump™. It covers system components, installation procedures, operational guidelines, maintenance schedules, troubleshooting, and specifications. The document also includes safety warnings, electrical data, and warranty information.

The system is designed for hydrocarbon recovery by creating a cone of depression in groundwater. It includes a pump, control module, and a density-actuated probe to detect water levels. The control module features a 3-position switch (HAND, OFF, AUTO) and indicator lights. Maintenance tasks include cleaning the probe, checking motor health, and replacing damaged electrical cords.

What's inside

  • Documentation Conventions
  • System Description
  • System Installation
  • System Operation
  • System Maintenance
  • System Troubleshooting
  • System Specifications
  • System Schematic
  • Replacement Parts List
  • Winch Assembly

Specifications

System TypeDeep Well Submersible, Shallow Well Submersible, Surface Mounted
Power Requirements_______ HP _______ Voltage _______ Phase _______ Amps Fuses _______ F1, _______ F2, _______F3
Sensor Cable Length_______ ft.
Start Cord Length_______ ft.
Intake Hose Length_______ ft.

Frequently asked questions

What is the purpose of the Water Table Depression Pump?

The Water Table Depression Pump is designed to facilitate the concentration and recovery of hydrocarbon by locally depressing the water table to create a 'cone of depression' into which polluting hydrocarbon will flow with the surrounding groundwater.

How does the control module function?

The control module turns the pump on when the level sensing probe is in water. It has a 3-position switch (HAND, OFF, AUTO) and indicator lights to show pump status and override conditions.

What maintenance is required weekly?

Weekly maintenance includes confirming the pump is cycling slowly while maintaining minimum flow rate, checking for moisture accumulation, and cleaning the probe in degreasing cleanser.

What is the warranty period?

The product is warranted for one (1) year from the date of first sale against defects in materials and workmanship.

Download PDF (2.2 MB)

More Geotech Environmental Equipment Inc. Manuals


View all Geotech Environmental Equipment Inc. manuals →