EVG 610 Mask Aligner Operation Manual

EVG 610 mask aligner SOP


EVG 610 Mask Aligner Operation Manual - cover page
Brand
EVG
Category
Industrial Robot
Document type
User Manual
Language
English
Pages
23
File format
PDF
File size
3.5 MB
Published
18 October, 2023
Updated
18 October, 2023
MD5 checksum
36B23FCC91493CA8401BA6E2CB35376E

About this manual

This document outlines the Standard Operating Procedure (SOP) for the EVG 610 mask aligner, specifically configured for a 2-inch chuck and flood exposure process with vacuum contact. It details the sequence for starting a session, including logging into the FOM, activating utilities like CDA, N2, and Vacuum lines, and selecting the appropriate recipe from the JC Baseline folder.

The guide provides step-by-step instructions for the physical operation of the machine, such as moving the tray, inserting the maskholder and loadframe, and aligning the stage. It concludes with procedures for removing the photomask, parking the tray, and safely turning off all utilities and logging off the system.

What's inside

  • Imaging operation
  • Start the process
  • Insert Maskholder
  • Insert Chuck
  • Insert Loadframe
  • Insert Mask
  • Move Tray in
  • Adjust Microscope
  • End of Process
  • Turn OFF utilities

Frequently asked questions

What chuck size is this manual based on?

This manual is based on a 2-inch chuck.

What are the alignment settings for the X and Y knobs?

The X and Y knobs align at 5mm and 0.

What is the rotation alignment setting?

The rotation aligns at 5.2 and 50.

Download PDF (3.5 MB)

More EVG Manuals


View all EVG manuals →