Restroom Direct 4430 Tri-Level Tubular Fountain Installation Guide

This is the installation manual for 4430 Tri-Level Tubular Fountain


Restroom Direct 4430 Tri-Level Tubular Fountain Installation Guide - cover page
Brand
Restroomdirect
Category
Other
Document type
Installation Guide
Language
English
Pages
4
File format
PDF
File size
589 KB
Published
18 October, 2023
Updated
18 October, 2023
MD5 checksum
262BF31BDD8A14A8A19A04AFB7C89FF2

About this manual

This document provides installation instructions for the Restroom Direct 4430 Tri-Level Tubular Fountain. It emphasizes the importance of reading the guide before starting and ensuring compliance with plumbing and electrical codes. The manual includes warnings about electrical grounding to prevent electrolysis and metallic tastes in the water.

What's inside

  • Installation Instructions
  • Safety Warnings
  • Parts List
  • Troubleshooting
  • Stream Height Adjustment

Specifications

Mounting Load Capacity300 lb.
Water Supply Tube Size3/8" O.D.
Drain Size1-1/2" IPS
Inlet Water Pressure Range20-105 PSI
Stream Height Factory Setting35 PSI

Frequently asked questions

What is the recommended mounting load capacity for the fountain?

The mounting structure must be capable of supporting a 300 lb. load on the fountain.

What size water supply line is required for installation?

A 3/8" unplated copper water line is required to connect the fountain to the supply line.

What is the acceptable inlet water pressure range?

The fountain is rated for inlet water pressure between 20-105 PSI.

How do you adjust the stream height?

Insert a small straight bladed screwdriver through the access hole in the center of the push button and turn the adjustment screw.

Download PDF (589 KB)

More Restroomdirect Manuals


View all Restroomdirect manuals →