Restroom Direct 4420 Bi-Level Tubular Fountain Installation Guide

Instructions for installing the 4420 Bi-Level Tubular Fountain


Restroom Direct 4420 Bi-Level Tubular Fountain Installation Guide - cover page
Brand
Restroomdirect
Document type
Installation Guide
Language
English
Pages
4
File format
PDF
File size
510 KB
Published
18 October, 2023
Updated
18 October, 2023
MD5 checksum
4F7E9926F61FA26F48ACD76DB48C316B

About this manual

This guide provides step-by-step instructions for installing the 4420 Bi-Level Tubular Fountain. It covers mounting, plumbing connections, electrical grounding, and stream height adjustment. The document emphasizes compliance with local codes and includes a parts list with item numbers and descriptions. Installation requires 3/8" copper tubing and 1-1/2" waste lines, with specific warnings about water pressure and electrical grounding to prevent damage or metallic taste in water.

What's inside

  • Mounting Requirements
  • Plumbing Connections
  • Electrical Grounding
  • Stream Height Adjustment
  • Parts List

Specifications

Water Pressure Rating20-105 PSI
Water Supply Tube3/8" O.D. unplated copper tube
Drain Line1-1/2" IPS

Frequently asked questions

What is the water pressure rating for this fountain?

This fountain is rated for inlet water pressure of 20-105 PSI.

What materials are required for plumbing connections?

Use 3/8" O.D. unplated copper tube for water supply and 1-1/2" IPS for waste lines.

How do I adjust the stream height?

Insert a small straight bladed screwdriver through the access hole and turn the adjustment screw clockwise to raise or counterclockwise to lower the stream.

Download PDF (510 KB)

More Restroomdirect Manuals


View all Restroomdirect manuals →