Blue Sky SB3024i Family DUO-Option Upgrade Manual

Describes the function of the DUO-option upgrade of the Solar Boost 3024i family of charge controllers


Blue Sky SB3024i Family DUO-Option Upgrade Manual - cover page
Brand
BLUEsky
Category
Other Electronics
Document type
Service Manual
Language
English
Pages
4
File format
PDF
File size
216 KB
Published
18 October, 2023
Updated
18 October, 2023
MD5 checksum
CEA89851E518820BD8D48F46F005225C

About this manual

This manual addendum applies to the Solar Boost 3024i family of charge controllers (Models: SB3024i, SB3024Di, SB3024iL, SB3024DiL) that have received the DUO-Option upgrade (part number Upgrade/3024DUO). The upgrade converts the unit's 20 amp auxiliary output into a separate 20 amp Diversion type charge controller, allowing the device to provide diversion control for hydroelectric or wind power sources while simultaneously providing MPPT type PV charge control.

What's inside

  • The DUO-Option
  • Diversion type charge control
  • Diversion charge control operation
  • Min-Power / Max-Power modes
  • Microprocessor installation
  • Dump Load selection and installation
  • Dump Load and optional Current Booster Module wiring

Specifications

Auxiliary Output Current20 amp
Diversion Controller Type100Hz Pulse Width Modulation (PWM)
Maximum Dump Load Current (Direct)20 amps
Maximum Dump Load Current (with CBM4070)40 amps
Over Current Protection (Direct)25 ampere maximum
Over Current Protection (with CBM4070)50 ampere maximum

Frequently asked questions

What models does this manual addendum apply to?

It applies to the Solar Boost 3024i family of charge controllers which have received the DUO-Option upgrade, specifically models SB3024i, SB3024Di, SB3024iL, and SB3024DiL.

What is the function of the DUO-Option upgrade?

The DUO-Option is a software-only upgrade that converts the auxiliary output into a separate 20 amp Diversion type charge controller for hydroelectric, wind, or similar unregulated DC generator sources.

How is the Min-Power / Max-Power mode selected?

The mode is selected using Dip #4 on the unit, where OFF corresponds to Min-Power Mode and ON corresponds to Max-Power Mode.

Is a microprocessor installation required for the field upgrade?

Yes, the microprocessor installation is required for the field upgrade, and it must be inserted with Pin-1 in the proper orientation.

Download PDF (216 KB)

More BLUEsky Manuals


View all BLUEsky manuals →