Samsara AG24 Dry Trailer Installation Guide

This document is the manual for AG24, which mainly introduces the use methods and precautions of AG24.


Samsara AG24 Dry Trailer Installation Guide - cover page
Brand
Samsara
Category
Other
Document type
Installation Guide
Language
English
Pages
3
File format
PDF
File size
201 KB
Published
17 October, 2023
Updated
17 October, 2023
MD5 checksum
B4E82EB69B39046C3C1E98591E7F42ED

About this manual

This guide explains how to install the Samsara AG24 sensor on a dry trailer. First, clean the mounting surface and attach the mounting plate using adhesive and self-tapping screws. Then mount the AG24 unit with flat-end screws. Finally, connect the cable to the 7-pin connector and verify the indicator light turns green, which may take 1 to 3 minutes.

What's inside

  • Mounting Location
  • Cleaning Surface
  • Mounting Plate Installation
  • AG24 Mounting
  • Cable Connection
  • Indicator Light Verification

Frequently asked questions

How long does it take for the AG light to turn on after connecting the cable?

The AG light turns on for 30 seconds if the connection is correct.

What color is the wire for the positive connection?

The wire for the positive connection is Brown.

Download PDF (201 KB)