Key facts
- Manuals
- 1
- Languages
- EN
- Last added
- 2023-10-17
Featured Samsara manuals

Samsara AG24 Dry Trailer Installation Guide
This guide explains how to install the Samsara AG24 sensor on a dry trailer. First, clean the mounting surface and attach the mounting plate using adhesive and self-tapping screws. Then mount the AG24 unit with flat-end screws. Finally, connect the cable to the 7-pin connector and verify the indicator light turns green, which may take 1 to 3 minutes.
Covers: Mounting Location · Cleaning Surface · Mounting Plate Installation · AG24 Mounting · Cable Connection · Indicator Light Verification
Latest Samsara manuals
Samsara AG24 Dry Trailer Installation Guide
Installation Guide 3 pages · 201 KB · ENInstallation guide for Samsara AG24 dry trailer sensor, including mounting and wiring steps.
Which document do I need?
Installation Guide
Mounting, wiring and first power-up. Read it before the hardware goes in.
Questions answered in Samsara manuals
How long does it take for the AG light to turn on after connecting the cable?
The AG light turns on for 30 seconds if the connection is correct.
What color is the wire for the positive connection?
The wire for the positive connection is Brown.
