EIMAC EWAD~T~B Series Air Cooled Chiller Installation Operation and Maintenance Manual

This manual provides detailed information on installation, operation and maintenance of Screw Compressor EWAD~T~B series chillers


EIMAC EWAD~T~B Series Air Cooled Chiller Installation Operation and Maintenance Manual - cover page
Brand
EIMAC
Category
Other
Document type
User Manual
Language
English
Pages
21
File format
PDF
File size
1.6 MB
Published
16 October, 2023
Updated
16 October, 2023
MD5 checksum
5651AAF963E20871ADE4DF7EC573A9E3

About this manual

This manual covers the installation, operation, and maintenance of the EIMAC EWAD~T~B series air-cooled chiller. It details safety precautions, mechanical and electrical installation requirements, and routine maintenance procedures to ensure proper unit performance and longevity. The document emphasizes that installation and startup must be performed by qualified professional personnel in accordance with local regulations.

What's inside

  • General Information
  • Receiving the unit
  • Operating limits
  • Mechanical Installation
  • Safety
  • Electrical Installation
  • Maintenance
  • Service and limited warranty
  • Disposal
  • List of figures

Specifications

RefrigerantR-134a
Product TypeAir cooled chiller

Frequently asked questions

Who is authorized to install and start up the unit?

The unit must be installed by a professional operator/technician and startup must be performed by authorized and trained professionals.

What are the minimum and maximum ambient temperatures for storing the unit?

The unit must be stored between a minimum of -20°C and a maximum of 57°C.

Download PDF (1.6 MB)