Key facts
- Manuals
- 1
- Languages
- EN
- Last added
- 2023-10-16
Featured EIMAC manuals

EIMAC EWAD~T~B Series Air Cooled Chiller Installation Operation and Maintenance Manual
This manual covers the installation, operation, and maintenance of the EIMAC EWAD~T~B series air-cooled chiller. It details safety precautions, mechanical and electrical installation requirements, and routine maintenance procedures to ensure proper unit performance and longevity. The document emphasizes that installation and startup must be performed by qualified professional personnel in accordance with local regulations.
Covers: General Information · Receiving the unit · Operating limits · Mechanical Installation · Safety · Electrical Installation
Latest EIMAC manuals
EIMAC EWAD~T~B Series Air Cooled Chiller Installation Operation and Maintenance Manual
User Manual 21 pages · 1.6 MB · ENThis manual provides installation, operation, and maintenance instructions for EIMAC EWAD~T~B series air-cooled chillers using R-134a refrigerant.
Which document do I need?
User Manual
Day-to-day operation, settings and troubleshooting. Start here if the product is already set up.
Questions answered in EIMAC manuals
Who is authorized to install and start up the unit?
The unit must be installed by a professional operator/technician and startup must be performed by authorized and trained professionals.
From: EIMAC EWAD~T~B Series Air Cooled Chiller Installation Operation and Maintenance Manual
What are the minimum and maximum ambient temperatures for storing the unit?
The unit must be stored between a minimum of -20°C and a maximum of 57°C.
From: EIMAC EWAD~T~B Series Air Cooled Chiller Installation Operation and Maintenance Manual
