This manual describes the configuration and installation method of the three-phase inverter with synergy technology.
This document serves as the installation guide for the SolarEdge Three Phase Inverter with Synergy Technology, specifically for European versions. It details the installation of the Power Optimizer, Primary Unit, Secondary Unit, and Connection Unit, along with grid connection procedures and system activation.
The equipment must be connected to inverters with a rated power greater than 20 kVA.
The equipment must be physically separated from residential environments by a distance greater than 30 m.
You must wait five minutes before opening the cover to avoid electric shock.