National Grid Transformer Replacement Program Implementation Manual

Introduction to National Grid's transformer replacement program, including project application process, cost-effectiveness evaluation and incentive levels


National Grid Transformer Replacement Program Implementation Manual - cover page
Brand
National Grid
Document type
User Manual
Language
English
Pages
25
File format
PDF
File size
1 MB
Published
16 October, 2023
Updated
16 October, 2023
MD5 checksum
BEB149CDD93337531503BAAFAC44FD62

About this manual

The document outlines a program providing incentives for the early replacement of existing, inefficient 25-300 KVA low-voltage dry-type distribution transformers. Eligibility is determined by comparing the installation date of the existing transformer against state-specific TP-1 adoption dates; units installed prior to these dates generally qualify if they do not meet current efficiency standards.

The manual provides specific requirements for replacement and downsizing, noting that new units must be 25-300 KVA and meet or exceed 2006 Federal efficiency standards. It also describes the process for determining cost-effectiveness using a Transformer Savings Tool (TST) and outlines incentive levels available after project approval.

What's inside

  • Transformer Program Description
  • Existing Transformer Requirements
  • Replacement Transformer Requirements
  • Transformer Downsizing Requirements
  • Savings Calculations
  • Determining Program Eligibility - Cost Effectiveness
  • Incentive Levels

Frequently asked questions

Do failed transformers qualify for replacement incentives?

No, the replacement of failed transformers does not qualify for incentives.

What is the required size range for replacement transformers?

Replacement transformers must be low-voltage dry-type units between 25- and 300 KVA.

What efficiency standard must new transformers meet?

New transformers must meet or exceed the 2006 Federal efficiency standard.