Featured National Grid manuals

National Grid Transformer Replacement Program Implementation Manual
The document outlines a program providing incentives for the early replacement of existing, inefficient 25-300 KVA low-voltage dry-type distribution transformers. Eligibility is determined by comparing the installation date of the existing transformer against state-specific TP-1 adoption dates; units installed prior to these dates generally qualify if they do not meet current efficiency standards.
The manual provides specific requirements for replacement and downsizing, noting that new units must be 25-300 KVA and meet or exceed 2006 Federal efficiency standards. It also describes the process for determining cost-effectiveness using a Transformer Savings Tool (TST) and outlines incentive levels available after project approval.
Covers: Transformer Program Description · Existing Transformer Requirements · Replacement Transformer Requirements · Transformer Downsizing Requirements · Savings Calculations · Determining Program Eligibility - Cost Effectiveness
Latest National Grid manuals
National Grid Transformer Replacement Program Implementation Manual
User Manual 25 pages · 1 MB · ENThis manual details the implementation of National Grid's incentive program for replacing low-voltage dry-type transformers with more efficient models.
Which document do I need?
User Manual
Day-to-day operation, settings and troubleshooting. Start here if the product is already set up.
Questions answered in National Grid manuals
Do failed transformers qualify for replacement incentives?
No, the replacement of failed transformers does not qualify for incentives.
From: National Grid Transformer Replacement Program Implementation Manual
What is the required size range for replacement transformers?
Replacement transformers must be low-voltage dry-type units between 25- and 300 KVA.
From: National Grid Transformer Replacement Program Implementation Manual