Ohaus Defender Series Base Installation and Maintenance Instructions

Introduces the installation and maintenance instructions for the Ohaus Defender Series Base.


Ohaus Defender Series Base Installation and Maintenance Instructions - cover page
Brand
OHAUS
Category
Other products
Document type
User Manual
Language
English
Pages
14
File format
PDF
File size
1 MB
Published
16 October, 2023
Updated
16 October, 2023
MD5 checksum
B1E0CA5262A09F414BBA3107BE761564

About this manual

The document serves as an instruction manual for the Ohaus Defender Series Base. It details safety precautions, unpacking procedures, and assembly steps including placing the weighing pan and connecting load cell cables to indicators using specific wiring codes.

The guide also covers site selection requirements such as leveling the base on a stable surface and avoiding hazardous environments. Maintenance instructions include cleaning protocols for external surfaces and food particles, while troubleshooting addresses common operational difficulties like loose connections or unstable environments.

What's inside

  • Introduction
  • Safety Precautions
  • Installation
  • Assembly
  • Wiring Connections
  • Selecting the Location
  • Maintenance
  • Cleaning
  • Troubleshooting
  • Technical Data

Specifications

Ambient Temperature-10°C to +40 °C
Relative Humidity10% to 90% non-condensing
Height above sea levelUp to 2,000m
Load Cell Protection (Aluminum)IP67
Load Cell Protection (Stainless Steel)IP65

Frequently asked questions

What are the safety precautions for operating the base?

Operate only under specified ambient conditions, ensure cables do not pose a tripping hazard, and do not operate in hazardous environments or unstable locations.

How should the weighing pan be installed?

Place the weighing pan securely over the rubber load pads on the top frame of the base.

Download PDF (1 MB)

More OHAUS Manuals


View all OHAUS manuals →