Clearwater LM Series Professional Installation Manual

This document is Clearwater Chlorinator User Manual and Warranty Information, which mainly introduces the functions, installation, use, maintenance of the product.


Clearwater LM Series Professional Installation Manual - cover page
Brand
Zodiac
Document type
User Manual
Language
English
Pages
32
File format
PDF
File size
457 KB
Published
03 August, 2012
Updated
30 September, 2023
MD5 checksum
9BA176DF3E6225809AE1D15850CBD050

About this manual

This manual provides instructions for installing and operating the Clearwater LM Series professional saltwater chlorinator. It covers safety precautions regarding electrical hazards, chemical use, and equipment pressure. The document details the installation of both the cell unit and the power pack, including requirements for plumbing connections and mounting positions to ensure proper airflow and prevent water contact.

What's inside

  • Safety Instructions
  • Product Specifications
  • Installation (Cell)
  • Flooded Plumbing Installation
  • Installing the Power Pack
  • How Your Chlorinator Works
  • Control Panel Functions
  • Operating Tips
  • Salt Management
  • Troubleshooting

Specifications

Minimum Flow rate12 gallons/minute
Maximum water temperature through the cell104 F
Maximum operating pressure29 psi
Power requirements220 volt 2 amp draw

Frequently asked questions

Can the Clearwater LM cell be installed vertically?

No, the cell must be installed horizontally with the ports down to form a natural gas trap.

What is the maximum salt level for this chlorinator?

The salt level should never exceed 13,000 ppm.

Where should the power pack be installed relative to the pool?

The power pack must be installed at least 3 feet from the pool edge.

Download PDF (457 KB)

More Zodiac Manuals


View all Zodiac manuals →