Qingdao Sifang Taihe DL-2000A Large Current Generator User Manual

This manual introduces the DL-2000A large current generator's product features, usage methods, precautions and other content.


Qingdao Sifang Taihe DL-2000A Large Current Generator User Manual - cover page
Brand
青岛四方泰合电气设备
Category
AC-DC Power
Document type
User Manual
Language
Chinese
Pages
3
File format
PDF
File size
111 KB
Published
12 March, 2012
Updated
30 September, 2023
MD5 checksum
30EB3AC9FC0A98DEBFB72661DE61C7A9

About this manual

The DL-2000A large‑current generator, produced by Qingdao Sifang Taihe, uses an energy‑saving autotransformer and high‑permeability current‑raising unit. It features a 0.5‑class digital meter with true‑RMS indication and an optional digital time‑counter, making it suitable for testing current transformers, protection devices and secondary circuits in power systems.

The manual describes the main technical parameters, step‑by‑step usage instructions, safety measures, and warranty conditions. It also provides guidance on proper connection, adjustment of output current, and precautions to avoid overheating during prolonged operation. This manual is written in Chinese.

What's inside

  • Overview
  • Main Technical Parameters
  • Usage Method
  • Safety Precautions
  • Warranty Conditions

Specifications

Working voltageSingle‑phase AC220V or AC380V, 50 Hz
Output voltageSingle‑phase AC0‑5V
Output currentSingle‑phase AC0‑2000A
DisplayDigital meter display
Time measurementCustomizable digital time‑counter

Frequently asked questions

How do I adjust the output current to the required value?

Turn the autotransformer clockwise evenly until the digital current indicator shows the desired large current.

Can the generator run continuously at its rated current?

No. The device is designed for short‑time operation and must not run at rated current for long periods to avoid overheating.

What safety step should be taken before starting a test?

Connect a standard ammeter (or external transformer) to the chassis to ensure measurement accuracy before testing.

What must be done after completing a test?

Return the autotransformer to the zero position, disconnect the power, and only then remove the test wiring.

Download PDF (111 KB)

More 青岛四方泰合电气设备 Manuals


View all 青岛四方泰合电气设备 manuals →