Haier BCD-258WBS/AWBX Refrigerator User Manual


Haier BCD-258WBS/AWBX Refrigerator User Manual - cover page
Brand
Haier
Document type
User Manual
Language
Chinese
Pages
2
File format
PDF
File size
7.4 MB
Published
24 February, 2012
Updated
29 February, 2012
Model
BCD-258
MD5 checksum
B2BBEC28D4EC40A1ED14A3AF547696F4

About this manual

This manual provides step‑by‑step guidance for installing, setting up, and safely operating the Haier BCD‑258WBS/AWBX refrigerator. It includes preparation steps, wiring requirements, and detailed explanations of the intelligent temperature control, fast‑freeze, and light‑wave preservation functions.

The document also covers warranty information, troubleshooting tips, cleaning and defrosting procedures, and recommended food‑storage practices for the fresh, variable‑temperature, and freezer compartments. This manual is written in Chinese.

What's inside

  • 使用准备
  • 技术数据
  • 功能介绍
  • 保修说明
  • 故障显示
  • 食品储存指南
  • 常见问题解答

Specifications

尺寸 (宽×深×高)610 mm × 600 mm × 1785 mm
制冷剂R600a 52 g

Frequently asked questions

冰箱不工作时应该检查哪些事项?

先确认电源已接通,检查插头和插座是否牢固,确保电压在220 V/50 Hz 范围内,然后检查门是否关闭严密。

冰箱的超温报警如何处理?

当 G 图标闪烁表示超温,检查门是否关闭严密或是否放入大量热食,待温度下降后报警会自动停止。

冰箱首次通电后需要等待多久再使用?

首次接通电源后让冰箱静置 30 分钟以上,再打开电源进行正常使用。

Download PDF (7.4 MB)

More Haier Manuals


View all Haier manuals →