Key facts
- Manuals
- 1
- Languages
- JA
- Last added
- 2026-11-16
Featured ケイプラ manuals

Keipla Fire-Resistant Double-Layer Pipe Design and Construction Manual (Japan Fire Equipment Safety Center Rated)
This Japanese design and construction manual covers the Keipla fire-resistant double-layer pipe (耐火二層管), a fire-rated piping product whose inner pipe is rigid PVC. According to the document, the pipe passed a 2-hour fire test at the Building Materials Testing Center and holds Ministry of Land, Infrastructure, Transport and Tourism certification as well as a performance rating from the Japan Fire Equipment Safety Center, and is approved as a fire compartment penetration method.
The manual gives safety warnings for design, installation and use, expansion joint standards and installation criteria, thermal expansion data and formulas for the inner PVC pipe, the installation workflow from material acceptance to testing, jointing work, penetration work at fire compartments, connection to fixtures and dissimilar pipes, repair methods, and maintenance and cleaning guidance. This manual is written in Japanese.
Covers: Safety and precautions for design, construction and use · Expansion joint standards · Expansion joint installation criteria · Thermal expansion of the inner PVC pipe · Expansion joint installation examples · Installation workflow
Latest ケイプラ manuals
Keipla Fire-Resistant Double-Layer Pipe Design and Construction Manual (Japan Fire Equipment Safety Center Rated)
Installation Guide 22 pages · 764 KB · JADesign and construction manual for Keipla fire-resistant double-layer pipe, MLIT-certified and rated by the Japan Fire Equipment Safety Center.
Which document do I need?
Installation Guide
Mounting, wiring and first power-up. Read it before the hardware goes in.
Questions answered in ケイプラ manuals
What certifications does the Keipla fire-resistant double-layer pipe have?
It holds Ministry of Land, Infrastructure, Transport and Tourism certification and a performance rating from the Japan Fire Equipment Safety Center, and is approved as a fire compartment penetration method.
Where should expansion joints be installed on vertical piping?
One per floor, installed directly above or near the pipe fitting; in shaft compartments without floor slabs, one every 4 m or less.
