open eir Duct Access Guidance to Operators Implementing Duct Access
This open eir document (version 2.0, May 2019) gives guidance to operators implementing duct access at the ingress and egress locations where operator chambers are interconnected with open eir chambers. It is meant to be read together with the wholesale regulated Duct Access product documentation, namely the Product Description, IPM and Technical & Operational Manual.
The document sets out the responsibilities of the operator: compliance with the Technical & Operational Manual, trained operatives and safety checks, advance notice to open eir, agreement of the access hole location with an open eir PQO before core drilling, limits on hole size, and sealing of gaps, ducts and sub-ducts with approved products. It also covers mid-point blows, the use of open eir underground utility boxes (UUB) for operator closures with their dimensions, and an appendix listing approved sealing materials, FTTx push-fit connectors and tubing suppliers.
Covers: Introduction · Responsibilities of the Operator · Mid-point blow · Operator closures in open eir Underground Utility Boxes (UUB) · Appendix 1 – Approved Products · Approved materials for sealing ducts
Latest open eir manuals
open eir Duct Access Guidance to Operators Implementing Duct Access
Installation Guide 8 pages · 635 KB · ENopen eir guidance for operators implementing duct access, covering access holes, sealing, mid-point blows and approved products.
Which document do I need?
Installation Guide
Mounting, wiring and first power-up. Read it before the hardware goes in.
Questions answered in open eir manuals
What size duct is needed to interconnect an operator chamber with an open eir chamber?
A 50 mm duct is sufficient for applications requiring single or three-way 14/10 mm sub-duct.
From: open eir Duct Access Guidance to Operators Implementing Duct Access
Who agrees the location of the access hole before core drilling?
An open eir PQO agrees the location of the access hole before the operative core drills it in the open eir chamber.
From: open eir Duct Access Guidance to Operators Implementing Duct Access