Key facts
- Manuals
- 1
- Languages
- ZH
- Last added
- 2023-11-15
Featured 特尔斯特 manuals

Te'ersite T3000 Series Transformer Comprehensive Tester User Guide (4th Edition)
This user guide from Suzhou Te'ersite Electronic Technology Co., Ltd. describes the T3000 Automatic Transformer Test System, a multifunctional transformer tester for the electronic transformer industry. It measures inductance (Lx), capacitance (Cx), AC resistance (ACR), impedance (|Z|), DC resistance (DCR), transformer phase, turns ratio, leakage inductance (Lk), pin short (PS) and balance.
The guide covers the product overview, specifications, accessories, installation, front and rear panel, basic and scan measurement operation (part number, pin, turns, inductance, leakage inductance, stray capacitance, impedance, AC/DC resistance, short and balance settings), system and communication settings, and the RS-232C and HANDLE interfaces. The standard configuration includes a 24Pin automatic scan test fixture, with an optional 48Pin fixture and built-in DC BIAS for network transformers. This manual is written in Chinese.
Covers: Introduction (前言) · Specifications (规格) · Accessories (附件说明) · Installation (安装) · Panel description (面板说明) · Operation instructions (操作说明)
Latest 特尔斯特 manuals
Te'ersite T3000 Series Transformer Comprehensive Tester User Guide (4th Edition)
User Manual 41 pages · 2.1 MB · ZHUser guide (4th edition, September 2014) for the T3000 series automatic transformer test system, covering specifications, operation, scan measurement and…
Which document do I need?
User Manual
Day-to-day operation, settings and troubleshooting. Start here if the product is already set up.
Questions answered in 特尔斯特 manuals
How long should the T3000 warm up before measuring?
The warm-up time is at least 20 minutes, and an open/short zero correction should be performed to ensure measurement accuracy.
From: Te'ersite T3000 Series Transformer Comprehensive Tester User Guide (4th Edition)
How long is the warranty for the T3000 tester?
The warranty period is one year from the delivery/shipping date for faults or damage under normal use; damage from improper operation is repaired at the user's expense.
From: Te'ersite T3000 Series Transformer Comprehensive Tester User Guide (4th Edition)
