City of Hobart Manuals

ManualLib has 1 City of Hobart manual. Every file can be read online or downloaded as a PDF for free.

Other 1

Key facts

Manuals
1
Languages
EN
Last added
2023-10-26

Latest City of Hobart manuals

Questions answered in City of Hobart manuals

What is the allowable release rate for development sites in Hobart?

The allowable release rate from any development site is 0.2 cubic feet per second per acre.

From: City of Hobart Stormwater Technical Standards Manual 2018

What design storm frequency is required for storm sewer sizing?

Storm sewers, inlets, catch basins, and curb and gutters shall be sized for at minimum the peak runoff from a 24-hour, 10-year frequency storm.

From: City of Hobart Stormwater Technical Standards Manual 2018