Featured City of Hobart manuals

City of Hobart Stormwater Technical Standards Manual 2018
The City of Hobart Stormwater Technical Standards Manual 2018 provides guidance for design and construction of stormwater management systems for any land disturbance within the City of Hobart, Indiana. Prepared by Butler Fairman & Seufert, it establishes design standards in a single reference document to ensure quality design and minimize impacts of development on the city's stormwater facilities. The manual applies to new development or redevelopment activities that disturb more than one acre or are part of a larger common plan.
The manual covers applicable policies, runoff rate determination using rational method and TR-55 computer modeling, detention storage volume calculations, storm sewer design standards including pipe sizing and Manning's equation, open channel design requirements for swales and channels, detention design standards, and reference tables for runoff coefficients, rainfall intensities, and depths. It also references Best Management Practices (BMP) and Low Impact Design (LID) manuals for post-construction stormwater quality measures.
Covers: Applicable Policies · Runoff Rate Determination · Detention Storage Volumes · Storm Sewer Design · Open Channel Design · Detention Design Standards
Latest City of Hobart manuals
City of Hobart Stormwater Technical Standards Manual 2018
Other 86 pages · 3.1 MB · ENMunicipal stormwater technical standards manual establishing design criteria for runoff rates, detention storage, storm sewers, and open channels in Hobart…
Questions answered in City of Hobart manuals
What is the allowable release rate for development sites in Hobart?
The allowable release rate from any development site is 0.2 cubic feet per second per acre.
From: City of Hobart Stormwater Technical Standards Manual 2018
What design storm frequency is required for storm sewer sizing?
Storm sewers, inlets, catch basins, and curb and gutters shall be sized for at minimum the peak runoff from a 24-hour, 10-year frequency storm.
From: City of Hobart Stormwater Technical Standards Manual 2018