Key facts
- Manuals
- 1
- Languages
- EN
- Last added
- 2023-10-20
Featured Arctic Stone manuals

Arctic Stone 1800 Installation Guide
This guide provides step-by-step instructions for installing Arctic Stone 1800 limestone veneer, including dry joint and mortar joint techniques. It covers preparation of surfaces, cutting tools, sealing options, and tips for achieving a natural stone look. The guide also includes installation tips for dressed edge, dry stacked, and ledgestone styles, with advice on color, texture, and spacing to enhance the natural appearance of the stone wall.
Covers: Installation Tips · Dry Joint Installation · Mortar Joint Installation · Dressed Edge Installation · Dry Stacked Installation · Ledgestone Installation
Latest Arctic Stone manuals
Arctic Stone 1800 Installation Guide
Installation Guide 7 pages · 1.1 MB · ENInstallation guide for Arctic Stone 1800 limestone veneer, covering dry joint and mortar joint methods, cutting, sealing, and surface prep.
Which document do I need?
Installation Guide
Mounting, wiring and first power-up. Read it before the hardware goes in.
Questions answered in Arctic Stone manuals
What is the maximum allowable deflection for the wall substrate before installing the stone?
The substrate must be plumb and true to within 1/8" in 10' (3mm in 3m) and 1/16" in 1'.
How should the joints be spaced when installing the Arctic collection with mortar?
The collection is designed to be installed with an 8-12mm mortar/grout joint.
