Key facts
- Manuals
- 1
- Languages
- EN
- Last added
- 2026-11-05
Featured MS Sedco manuals

MS Sedco AccuGuard HP2 Modular Safety Beam System Installation Guide
This guide provides step-by-step instructions for installing the AccuGuard HP2 modular safety beam system, including mounting the control module and beam heads, wiring connections, and system setup. It also covers system inspection, compliance with ANSI/BHMA standards, and warranty information. The system is designed for fail-safe operation when beams are interrupted or power is lost.
Covers: General Description · Installation · Wiring · Set Up Instructions · System Inspection and Instructions · Technical Data
Latest MS Sedco manuals
MS Sedco AccuGuard HP2 Modular Safety Beam System Installation Guide
Installation Guide 4 pages · 232 KB · ENInstallation instructions for the MS Sedco AccuGuard HP2 active infrared 2-beam safety system, including mounting, wiring, setup, and system inspection.
Which document do I need?
Installation Guide
Mounting, wiring and first power-up. Read it before the hardware goes in.
Questions answered in MS Sedco manuals
What happens if a beam is interrupted or power is lost?
The Control Module signals the door to open, providing a failsafe system.
From: MS Sedco AccuGuard HP2 Modular Safety Beam System Installation Guide
What voltage range is required to power the AccuGuard HP2 Control Module?
The system requires a power supply of 12-24 V AC or DC.
From: MS Sedco AccuGuard HP2 Modular Safety Beam System Installation Guide
