CUBIS AX-S Concrete Covers Installation Guide
The document serves as an installation guide for CUBIS AX-S concrete covers, frames, and cross pieces. It emphasizes that these components are manufactured as complete units and must be inspected for defects before installation. A critical requirement is ensuring the frame is fully supported by the access chamber to carry the designed load.
Covers: APPLICATION NOTES · INSTALLATION · MORTAR BED · FRAME SUPPORT · LEVELING · BACKFILLING
Latest Cubis manuals
CUBIS AX-S Concrete Covers Installation Guide
Installation Guide 1 pages · 158 KB · ENThis guide provides installation instructions for CUBIS AX-S concrete covers, detailing preparation, mortar bed requirements, and leveling procedures.
Which document do I need?
Installation Guide
Mounting, wiring and first power-up. Read it before the hardware goes in.
Questions answered in Cubis manuals
What is the minimum mortar bed thickness required under the frame?
A minimum 20mm thick bed of mortar must be placed around the uppermost surface of the chamber.
How far below the finished footway surface should the chamber walls be completed?
The top of the chamber walls should be completed a minimum of 60mm below the finished footway surface.