Key facts
- Manuals
- 2
- Languages
- EN
- Last added
- 2023-10-31
Featured Carbolite manuals

Carbolite TZF & GZF 1200°C 3-Zone Tube Furnace Installation, Operation & Maintenance Instructions
This manual covers the Carbolite TZF and GZF three-zone tube furnaces rated for 1200°C, which are designed to achieve a single heating zone of extended temperature uniformity. The TZF range uses a ceramic work tube wound with resistance wire, while the GZF range uses modular heating elements of resistance wire partially embedded in lightweight refractory fibre. Controller manuals are supplied separately and should be read before operating the furnace.
The document explains unpacking and handling, siting and electrical connections, the three available 3-zone control methods (back-to-back thermocouples, broadcast comms retransmission, and independent zones), plus maintenance, repairs, fault analysis, circuit details, fuses and power settings, and specifications.
Covers: Introduction · Installation · Operation · Maintenance · Repairs & Replacements · Fault Analysis

Carbolite RHF 1400°C - 1600°C Chamber Furnaces Installation, Operation & Maintenance Instructions
This manual is for Carbolite RHF chamber furnaces rated 1400°C to 1600°C, with models from 3 litre to 35 litre. It is intended as guidance for operators and should be read before the furnace is connected to the electricity supply, with controller operation covered in separate manuals.
It covers symbols and warnings, installation and siting, electrical connections, the operating cycle and general operating advice, maintenance, repairs and replacements, fault analysis, circuit diagrams, fuses and power settings, and specifications. It also notes safety points such as lifting the furnace by its base, keeping vents unobstructed, and checking the rating label before connection.
Covers: Symbols & Warnings · Installation · Operation · Maintenance · Repairs & Replacements · Fault Analysis
Latest Carbolite manuals
Carbolite TZF & GZF 1200°C 3-Zone Tube Furnace Installation, Operation & Maintenance Instructions
User Manual 20 pages · 137 KB · ENInstallation, operation and maintenance instructions for Carbolite TZF and GZF 1200°C three-zone tube furnaces.
Carbolite RHF 1400°C - 1600°C Chamber Furnaces Installation, Operation & Maintenance Instructions
User Manual 16 pages · 741 KB · ENCarbolite RHF chamber furnace manual covering installation, operation, maintenance and specifications for 1400°C to 1600°C models.
Which document do I need?
User Manual
Day-to-day operation, settings and troubleshooting. Start here if the product is already set up.
Questions answered in Carbolite manuals
How should I lift or move the furnace?
Always lift it by its base or by both ends of the main body, never by the work tube or surrounding insulation; for larger models use two people.
Can GZF 3-phase models be rewired for single-phase supply?
Yes, from Year 2000 GZF models ordered for 3-phase supply can be rewired between 1-phase and 3-phase supplies in the ranges 380/220V–415/240V and 208-240V, but not 3-phase star without neutral.
How should the furnace be lifted when unpacking or moving it?
Lift it by its base, never by the door, and use two or more people to carry it where possible.
What should be checked before connecting the furnace to the supply?
Check the furnace rating label before connection. The supply voltage should agree with the voltage on the label.
