Key facts
- Manuals
- 1
- Languages
- EN
- Last added
- 2023-10-16
Featured Amersham Biosciences manuals

Amersham Biosciences CU-950 Installation Guide
The CU-950 unit consists of a back panel with connectors and three indicator lamps (Power, PC, and System) on the front. It is supplied with a power converter and mains cables for EU and US regions. The unit is designed to be hung on the side of the AKTA system, specifically on the UV-900 or UPC-900 depending on the system type.
Installation involves connecting the UniNet-1 data communication cable between the CU-950 and the specific pump (P-900 or P-920) or controller within the AKTA system. If a fraction collector is used, it must be connected via a UniNet-1 cable to the pump or controller, and then a 1.5 m UniNet-1 cable connects the fraction collector to the CU-950. Finally, a USB cable connects the CU-950 to the computer.
Covers: Description · Front panel LEDs · Back panel · Installation with AKTAexplorer · Installation with AKTApurifier · Installation with AKTAbasic
Latest Amersham Biosciences manuals
Amersham Biosciences CU-950 Installation Guide
Installation Guide 8 pages · 450 KB · ENThis guide provides installation instructions for the CU-950 unit with AKTA basic, AKTAexplorer, AKTApurifier, AKTAFPLC, and AKTApilot systems.
Which document do I need?
Installation Guide
Mounting, wiring and first power-up. Read it before the hardware goes in.
Questions answered in Amersham Biosciences manuals
What systems is the CU-950 compatible with?
The instruction describes how to install the CU-950 with AKTAbasic, AKTAexplorer, AKTApurifier, AKTAFPLC, and AKTApilot.
How long is the UniNet-1 cable used for fraction collectors?
A 1.5 m UniNet-1 cable connects the fraction collector to the CU-950.
