SAIC-GM C1UL Manuals

ManualLib has 2 documents for the SAIC-GM C1UL (Car parts): 2 installation guides. Every file can be read online or downloaded as a PDF for free.

Installation Guide 2

Key facts

Brand
SAIC-GM
Model
C1UL
Category
Car parts
Industry
Automotive
Documents
2
Languages
ZH
Last added
2022-12-15

Start here

SAIC-GM Genuine Accessories C1UL Side Step Installation Manual

SAIC-GM Genuine Accessories C1UL Side Step Installation Manual

Installation Guide 4 pages · 472 KB · ZH

This document is an installation guide for the SAIC-GM Genuine Accessories C1UL side step (登车踏板). It details the necessary tools, parts list with dimensions, and a step-by-step procedure for installing the left or right side steps on compatible vehicles. The manual emphasizes safety precautions such as wearing gloves and protecting the vehicle's surface during installation. This manual is written in Chinese.

Read online

SAIC-GM C1UL specifications

Product ModelC1UL
Support Frame 1 Dimensions58x50x4.9 mm
Support Frame 2 Dimensions58x50x9.2 mm
Support Frame 3 Dimensions58x50x13.5 mm
Self-tapping Screw Torque2.5±0.5 NM
M8 Bolt Torque22±3 NM

Source: SAIC-GM Genuine Accessories C1UL Side Step Installation Manual

All SAIC-GM C1UL documents by type

Installation Guide 2

Mounting, wiring and first power-up. Read it before the hardware goes in.

Questions answered in these manuals

What tools are required for installation?

The required tools include a clip pry bar, torque wrench, 13mm long socket, 13mm short socket, T15 bit, and ST4.2 self-tapping screws.

From: SAIC-GM Genuine Accessories C1UL Side Step Installation Manual

What is the recommended torque for the M8 bolts?

The recommended torque for the M8 bolts is D22±3 NM.

From: SAIC-GM Genuine Accessories C1UL Side Step Installation Manual

What is the labor time required for this installation?

The stated labor time for installing these pedals is 0.5 hours.

From: SAIC-GM C1UL Sports Pedal Installation Instructions