Key facts
- Brand
- SAIC-GM
- Model
- C1UL
- Category
- Car parts
- Industry
- Automotive
- Documents
- 2
- Languages
- ZH
- Last added
- 2022-12-15
Start here

SAIC-GM Genuine Accessories C1UL Side Step Installation Manual
This document is an installation guide for the SAIC-GM Genuine Accessories C1UL side step (登车踏板). It details the necessary tools, parts list with dimensions, and a step-by-step procedure for installing the left or right side steps on compatible vehicles. The manual emphasizes safety precautions such as wearing gloves and protecting the vehicle's surface during installation. This manual is written in Chinese.
Read onlineSAIC-GM C1UL specifications
| Product Model | C1UL |
|---|---|
| Support Frame 1 Dimensions | 58x50x4.9 mm |
| Support Frame 2 Dimensions | 58x50x9.2 mm |
| Support Frame 3 Dimensions | 58x50x13.5 mm |
| Self-tapping Screw Torque | 2.5±0.5 NM |
| M8 Bolt Torque | 22±3 NM |
Source: SAIC-GM Genuine Accessories C1UL Side Step Installation Manual
All SAIC-GM C1UL documents by type
Mounting, wiring and first power-up. Read it before the hardware goes in.
Questions answered in these manuals
What tools are required for installation?
The required tools include a clip pry bar, torque wrench, 13mm long socket, 13mm short socket, T15 bit, and ST4.2 self-tapping screws.
From: SAIC-GM Genuine Accessories C1UL Side Step Installation Manual
What is the recommended torque for the M8 bolts?
The recommended torque for the M8 bolts is D22±3 NM.
From: SAIC-GM Genuine Accessories C1UL Side Step Installation Manual
What is the labor time required for this installation?
The stated labor time for installing these pedals is 0.5 hours.
