The WEINMANN WBS and WBZ carpentry machines brochure details features, technical data, processing options, software and service solutions.
The WBS and WBZ series are fully automated, high‑speed carpentry machines designed for timber‑frame, log‑house and prefabricated house construction. They combine fast cutting, 5‑axis routing, and flexible tool changing to increase productivity and precision.
The brochure provides technical specifications such as a 555 mm saw blade, 0‑360° rotating angle, up to 12‑slot tool changers, and power requirements of 7.5 kW (saw) to 20 kW (processing). It also describes the integrated software suite (wupWorks, wupEditor, woodScout, MMR) and the comprehensive LifeCycleService support package.
| Saw blade diameter | 555 mm |
|---|---|
| Rotating angle | 0‑360° |
| Swivel angle | 0‑90° |
| Suction volume | 1,800 m³/h |
| Power requirement (sawing unit) | 7.5 kW |
| Power requirement (processing) | 10‑20 kW |
| Speed per processing | 2‑10 sec |
| Position accuracy | ±0.01 mm |
| Minimum cross‑section | 20 × 50 mm |
| Maximum cross‑section | 200 × 455 mm |
| Minimum raw timber length | 1,000 mm |
| Support height | 860 mm |
The processing speed ranges from 2 to 10 seconds per operation.
The WBS 140 is equipped with an 8‑slot tool changer with a pickup station.