This manual provides safety instructions, installation, wiring, operation, parameter tables, troubleshooting and maintenance for the S200 construction…
The manual opens with extensive safety notices, stating that only trained personnel may operate the drive, power must be disconnected before any wiring work, grounding and ESD precautions are required, and all safety symbols must be observed.\n\nIt then covers installation dimensions, wiring diagrams, keyboard layout, functional parameter tables (input voltage, output voltage, power rating, efficiency, overload capacity), fault diagnosis, recommended accessories, periodic inspection, and quality‑assurance information for the S200 integrated drive used in construction elevators. This manual is written in Chinese.
| Input voltage | 380 V AC, 50/60 Hz (three‑phase) |
|---|---|
| Output voltage | 380 V AC (three‑phase) |
| Efficiency | ≥96 % |
| Overload capacity | 150 % of rated current for 1 minute |
Read all safety notices, ensure only trained personnel operate the equipment, disconnect power before wiring, secure grounding, avoid static discharge, and follow all warning symbols.
Check that the key switch is on, the emergency stop is released, safety interlocks (anti‑fall, cage‑inner stop) are satisfied, and that the start indicator lights are illuminated.
The drive is designed for three‑phase 380 V AC at 50 Hz or 60 Hz, with an optional 220 V input version.