Verlinde BGV-C1 StageMaker Controller Installation Maintenance Manual

Installation and maintenance manual for the Verlinde BGV-C1 StageMaker Controller, covering operation, safety, cable selection, and troubleshooting for…


Verlinde BGV-C1 StageMaker Controller Installation Maintenance Manual - cover page
Brand
Verlinde
Category
Industrial Robot
Document type
User Manual
Language
English
Pages
20
File format
PDF
File size
927 KB
Published
24 October, 2026
Updated
24 October, 2026
MD5 checksum
EAADA90404A26FFF9E88069F86E150CE

About this manual

This manual provides installation, maintenance, and operational instructions for the Verlinde STAGEMAKER CONTROLLER BGV-C1. It is designed for use with VERLINDE STAGEMAKER chain hoists (series SM5 and SM10) and covers three controller versions: A (direct control), B (low voltage control), and D (low voltage control for BGV-C1 hoists). The document details functional descriptions, cable selection, connection tables, and troubleshooting procedures.

What's inside

  • Introduction
  • What to do - What not to do
  • Guarantee
  • Identification
  • Functional description
  • Cable selection table
  • Cable connection tables
  • Trouble shooting
  • Specifications

Specifications

Compatible Hoist SeriesSTAGEMAKER chain hoists series SM5 and SM10
Channel Options4 – 8 or 12 channels
Remote Control Cable Length10m
Thermal Protection Scopeper group of 4 hoists

Frequently asked questions

Which hoist series is the BGV-C1 controller compatible with?

The controller is specifically developed for VERLINDE STAGEMAKER chain hoists series SM5 and SM10.

What are the available channel configurations for the controller?

The controllers are available with 4, 8, or 12 channels.

What is the length of the connection cable for PRM models with remote control?

The connection cable length for the remote control box is 10 meters.

Download PDF (927 KB)