Val-Matic 2-42 in. Flanged Vacuum Breaker Operation, Maintenance and Installation Manual

This manual covers the operation, installation, and maintenance of Val-Matic 2-42 inch flanged vacuum breakers used to prevent vacuum conditions in pipelines.


Val-Matic 2-42 in. Flanged Vacuum Breaker Operation, Maintenance and Installation Manual - cover page
Brand
Val-Matic
Category
Other
Document type
User Manual
Language
English
Pages
8
File format
PDF
File size
392 KB
Published
23 November, 2026
Updated
23 November, 2026
MD5 checksum
0CA2C494710CA15B9E6A9A8033A9DA50

About this manual

This manual provides instructions for the proper installation and maintenance of the Val-Matic 2-42 inch flanged vacuum breaker. The device is designed to allow air into a pipeline or tank during critical vacuum conditions caused by power failure or rapid draining, while preventing air from escaping when positive pressure is restored. It is constructed with a cast iron body and bronze or stainless steel trim.

What's inside

  • Introduction
  • Receiving and Storage
  • Description of Operation
  • Installation
  • Valve Construction
  • Maintenance
  • Troubleshooting
  • Disassembly
  • Reassembly
  • Warranty

Specifications

MaterialCast Iron Body, Bronze or Stainless Steel Trim
Operating PressureUp to 250 psi (implied by 250# flange data)
Activation Threshold-0.25 psig
ApplicationHorizontal pipelines or over tanks

Frequently asked questions

Is this valve suitable for wastewater?

No, this valve is not intended for fluids containing suspended solids such as wastewater.

Does the valve require lubrication?

No, the vacuum breaker requires no scheduled lubrication.

What is the recommended method for tightening flange bolts?

Bolts should be tightened using the cross-over tightening method in graduated steps.

Download PDF (392 KB)

More Val-Matic Manuals


View all Val-Matic manuals →