Tuntex Square Carpet Installation Guide

This guide provides instructions for installing Tuntex square carpets, covering preparation, adhesive application, and layout.


Tuntex Square Carpet Installation Guide - cover page
Brand
Tuntex
Category
Other
Document type
Installation Guide
Language
Chinese
Pages
4
File format
PDF
File size
4 MB
Published
16 November, 2026
Updated
16 November, 2026
MD5 checksum
5A21F6F2E43C0A6F62190EC1520A5333

About this manual

This manual details the installation procedures for Tuntex square carpets. It emphasizes the importance of acclimating the product to the environment before installation and ensuring the subfloor is clean, dry, and free of contaminants. The guide specifies requirements for concrete moisture and pH levels to prevent future damage. This manual is written in Chinese.

What's inside

  • Pre-installation Checks
  • Subfloor Preparation
  • Adhesive Application
  • Layout and Installation
  • Cutting and Trimming
  • Post-Installation Care

Frequently asked questions

How long should Tuntex carpets be acclimated before installation?

The product must be unpacked and placed in the installation environment for at least 24 hours before installation and for 48 hours after.

What is the acceptable pH range for the subfloor?

The subfloor alkalinity level must be between pH 7 and pH 9.

How long does new concrete need to cure before carpet installation?

New concrete generally requires a curing period of 90 to 120 days.

Download PDF (4 MB)