Teledyne ISCO ACCQPrep SFC Pre-Installation Guide

This guide outlines site preparation, space, electrical, and carbon dioxide requirements for installing the Teledyne ISCO ACCQPrep SFC system.


Teledyne ISCO ACCQPrep SFC Pre-Installation Guide - cover page
Brand
Teledyne Isco
Category
Industrial Supply
Document type
Installation Guide
Language
English
Pages
18
File format
PDF
File size
537 KB
Published
31 October, 2026
Updated
31 October, 2026
MD5 checksum
188A3A3FF22585B77AA329A4515A7CB7

About this manual

This document serves as a pre-installation guide for the Teledyne ISCO ACCQPrep SFC system, detailing the necessary site evaluations and preparations to ensure successful installation. It covers responsibilities, receiving considerations, and the review of supporting documents such as safety information and operation guides.

What's inside

  • Purpose
  • Receiving Considerations
  • Space and Weight Requirements
  • Environment Requirements
  • Electrical Requirements
  • Carbon Dioxide Requirements

Specifications

Dimensions41 x 56 x 73 cm (16.25 x 22.25 x 28.75 in)
Weight38.2 kg (84.5 lbs)
Ambient Temperature Range20 to 40 °C
Maximum Relative Humidity90% relative humidity
Maximum Altitude2000 m
Power Input120(+-10%) or 240 (+-10%) VAC, 50/60 Hz, 300 VA
Power Consumption1350 watts (average at 200 mL/min system flow)
CO2 Purity Requirement99.97% (food-grade) or better

Frequently asked questions

What documents should be reviewed before scheduling installation?

Review the ACCQPrep SFC Important Information, Installation Guide, and Operation Guide listed in Table 1-1.

What power source is required for the system?

A dedicated, earthed (grounded) power source with accessible receptacles sharing a common ground is required.

What CO2 purity is required for the system?

The system requires liquid CO2 with a purity of 99.97% (food-grade) or better.

Download PDF (537 KB)

More Teledyne Isco Manuals


View all Teledyne Isco manuals →