TBS Electronics Omnicharge Solar OCS 100-20, 100-30 and 100-50 MPPT solar charge controllers installation manual with safety, wiring and specs.
The TBS Electronics Omnicharge Solar MPPT solar charge controller is described in models OCS 100-20 (100 V/20 A), OCS 100-30 (100 V/30 A) and OCS 100-50 (100 V/50 A). This installation manual covers safety precautions, installation precautions, mounting, wiring details and commissioning.
The manual is intended for installers with knowledge of electrical equipment installation, applicable codes and electrical hazards. It gives the required wiring order, terminal tightening torque, cable and fuse tables, ambient temperature limits and technical specifications.
| OCS 100-20 PV input / battery charge current | 20 A / 20 A |
|---|---|
| OCS 100-30 PV input / battery charge current | 30 A / 30 A |
| OCS 100-50 PV input / battery charge current | 50 A / 50 A |
| Battery fuse rating, OCS 100-20 | 25 A to 30 A |
| Battery fuse rating, OCS 100-30 | 40 A to 50 A |
| Battery fuse rating, OCS 100-50 | 70 A to 85 A |
| Ambient operating temperature | -35°C to +60°C |
| PV and battery terminal tightening torque | 2 to 2.5 Nm |
Connect the battery positive cable first, then the battery negative cable, and wait 3 seconds for automatic battery voltage detection before connecting the PV cables.
It is 50 A, and the advised minimum PV wire size is 10 mm².
No. It must always be mounted with the connections pointing downwards; otherwise proper functionality and safety cannot be guaranteed.
De-energize the solar panel input by opening the advised double pole circuit breaker in the PV line or by covering the solar panels.