Sun Fire E6900/E4900 System Installation Guide

This guide provides detailed steps for installing, configuring, and operating the Sun Fire E6900 and E4900 systems.


Sun Fire E6900/E4900 System Installation Guide - cover page
Brand
Sun Microsystems
Category
Servers Computer
Document type
Installation Guide
Language
Chinese
Pages
54
File format
PDF
File size
3.9 MB
Published
15 October, 2026
Updated
15 October, 2026
MD5 checksum
A93D0FE6DC9F590F92597F90BEDA2D13

About this manual

This document serves as the installation guide for the Sun Fire E6900 and Sun Fire E4900 systems. It covers the preparation of the installation site, including checks for power circuits, air conditions, and flooring. The guide details the specific procedures for moving, fixing, and connecting these systems to power and I/O components. This manual is written in Chinese.

What's inside

  • Installation Preparation
  • Checking Power Circuits
  • Checking Air Conditions
  • Checking Flooring
  • Moving and Fixing the System
  • Connecting Power Cables
  • Connecting I/O Components
  • Connecting Management Console
  • Turning On Power
  • Turning Off Power

Frequently asked questions

How many dedicated circuit breakers are required for a Sun Fire E6900 system?

The Sun Fire E6900 system requires four dedicated 200–240 VAC 30A circuit breakers.

How many dedicated circuit breakers are required for a Sun Fire E4900 system?

The Sun Fire E4900 system requires two dedicated 200–240 VAC 30A circuit breakers.

What type of cable connects an ASCII terminal to the TTYa serial port?

An ASCII terminal must be connected using a crossover modem cable.

Download PDF (3.9 MB)

More Sun Microsystems Manuals


View all Sun Microsystems manuals →