Sudian Electric SDLYC-II-600KN Horizontal Tension Testing Machine User Manual

The manual describes operation, parameters, and maintenance of the SDLYC-II-600KN horizontal tension testing machine.


Sudian Electric SDLYC-II-600KN Horizontal Tension Testing Machine User Manual - cover page
Brand
Sudian Electric
Document type
User Manual
Language
Chinese
Pages
9
File format
PDF
File size
368 KB
Published
06 October, 2026
Updated
06 October, 2026
MD5 checksum
76C90CAD20C04FE4993E829E1B65A928

About this manual

This user manual provides a complete overview of the SDLYC-II-600KN horizontal tension testing machine, including its structure, control system, and typical applications such as testing safety belts, helmets, cables, and other lifting tools. The system combines a high‑precision sensor, hydraulic actuation, and a computer‑controlled interface for automated load setting, timing, and result evaluation.

The document details the hardware layout (control cabinet, touch screen, power and printer modules), the hydraulic and electrical specifications, and step‑by‑step operating procedures. It also covers data acquisition, report generation, and daily maintenance guidelines to ensure safe and reliable operation. This manual is written in Chinese.

What's inside

  • Overview
  • System Main Parameters
  • Working Principle
  • System Operation Instructions
  • Front Panel Description
  • Computer Interface Operation
  • Data Query and Report Printing
  • Daily Use and Maintenance

Specifications

Maximum Load600 kN
System Test AccuracyBetter than 1 % FS
System Control AccuracyBetter than 10 %
Sampling RateUp to 100 Hz
Power SupplyThree‑phase four‑wire 380 V
Hydraulic High‑Pressure Rating15 MPa
High‑Pressure Flow0.2 L/min
Low‑Pressure Flow4 L/min
Low‑Pressure Working Pressure5 MPa
Input Voltage per Phase220 V (±5 %)

Frequently asked questions

What is the maximum load capacity of the machine?

The machine can test up to 600 kN of tensile force.

How is a test started after the system is powered on?

Open the control cabinet, turn on the main power switch, then the control‑computer power switch, and finally start the test via the computer interface.

Download PDF (368 KB)