Sub-Zero PRO 48 Refrigeration Installation Guide

Installation guide for the Sub-Zero PRO 48 refrigeration unit, covering dimensions, electrical, plumbing, anti-tip bracket, placement, water line, and…


Sub-Zero PRO 48 Refrigeration Installation Guide - cover page
Brand
Sub-Zero
Category
Refrigerators
Document type
Installation Guide
Language
English
Pages
32
File format
PDF
File size
901 KB
Published
17 November, 2026
Updated
17 November, 2026
MD5 checksum
96F4E08B18C204DB6AEC6AD6DD923A7A

About this manual

The Sub-Zero PRO 48 installation guide provides site preparation and installation instructions for the refrigeration unit. It covers standard and flush opening dimensions, electrical and plumbing requirements, tools and materials, and preparation steps such as uncrating and grille removal.

The guide also describes anti-tip bracket installation for wood or concrete floors, placement and water line connection, and alignment of the unit, doors, and drawers. Product information, including the model and serial number, is located on the rating plate inside the cabinet to the left of the upper freezer drawer.

What's inside

  • Product Information
  • Tools and Materials
  • Opening Dimensions
  • Electrical
  • Plumbing
  • Preparation
  • Anti-Tip Bracket
  • Placement
  • Water Line
  • Alignment

Specifications

Electrical Supply115 VAC, 60 Hz
Electrical Service15 amp
Receptacle3-prong grounding-type
Water Supply Tubing1/4" OD copper, braided stainless steel or PEX tubing
Water Pressure35–120 psi (2.4–8.3 bar)
Standard Opening Dimensions47 1/2" W × 83 3/4" H × 24" D
Flush Opening Dimensions48" W × 84 1/8" H × 26" D
Anti-Tip Bracket Depth, Standard Installation24" (610)

Frequently asked questions

Where is the rating plate located?

The rating plate is located inside the cabinet, to the left of the upper freezer drawer.

What electrical supply is required for the PRO 48?

The unit requires a 115 VAC, 60 Hz electrical supply.

What water pressure is required?

The water supply pressure should be 35–120 psi (2.4–8.3 bar).

How long must the unit stand upright before connecting power if it has been on its back or side?

It must stand upright for a minimum of 24 hours before connecting power.

Download PDF (901 KB)

More Sub-Zero Manuals


View all Sub-Zero manuals →