Assembly guide for the Square Deal B reloader, covering parts identification, mounting, and initial setup.
This document provides step-by-step assembly instructions for the Square Deal “B” reloader. It begins with a parts list and proceeds through mounting the chute bracket, securing the machine to a bench, installing the spent primer bracket, locator buttons, powder measure, failsafe rod, spent primer cup, and low primer alarm.
After completing the assembly, the user is directed to the separate Square Deal “B” instruction manual for reloading operations. The guide includes detailed photographs and notes on proper torque and alignment for each component.
The reloader includes a Loaded Cartridge Bin, Empty Caliber Conversion Box, Spent Primer Cup and Bracket, Allen Wrench Set, Large Powder Bar, Powder Measure with Small Powder Bar, Chute Bracket, Instruction Manual, Primer Tube Pack, and Low Primer Alarm.
Use the two 1/4-20 x 3/8" mounting screws from the Primer Tube Pack and the appropriate Allen wrench to secure the Chute Bracket to the right side of the frame.
Use 1/4" diameter bolts (not included) with washers on top and bottom, and drill 5/16" holes in the bench; do not use wood screws.
Push the handle forward, then tighten the blue wing nut until the coil spring is compressed enough to barely allow a business card to slip between the coils.