Space Ray PBF Series Infrared Radiant Poultry Tube Heater Installation Manual

Installation and operation instructions for Space Ray PBF infrared radiant poultry tube heaters, covering safety, wiring, venting and maintenance.


Space Ray PBF Series Infrared Radiant Poultry Tube Heater Installation Manual - cover page
Brand
Space-Ray
Document type
Installation Guide
Language
English
Pages
63
File format
PDF
File size
5.7 MB
Published
01 October, 2026
Updated
01 October, 2026
MD5 checksum
420ACDD8C2DD11025C869E8FD4A62735

About this manual

This manual provides detailed safety guidelines, installation requirements, and operating procedures for Space Ray infrared radiant poultry tube heaters. It covers both single‑stage (N5/L5) and two‑stage (N7/L7) gas valve options and includes instructions for gas, electrical, and ventilation connections.

The document also includes specifications, minimum clearances to combustibles, typical assembly layouts, troubleshooting steps, and a parts replacement guide to help installers and service technicians maintain reliable heater performance.

What's inside

  • Safety
  • Installer Responsibility
  • General Information
  • Minimum Clearances to Combustibles
  • Specifications
  • Assembly Layouts
  • Gas Connections and Regulations
  • Electrical Connections
  • Venting
  • Troubleshooting Guide

Specifications

High Input (2‑stage) BTU/hr (PBF 60)60,000
Low Input BTU/hr (PBF 60)40,000
Orifice Size – Natural Gas (PBF 60)#27 (0.144)
Control Option – Single Stage Natural GasN5
Control Option – Two Stage Propane GasL7

Frequently asked questions

What gas types can the heater be installed with?

The heater can be installed for use with either Natural Gas or Propane (LP) Gas.

What are the minimum clearances to combustibles for the PBF 60 model?

For the PBF 60 model the required clearances are 36 in. horizontally, 12 in. on the sides, 69 in. to the ceiling, and 32 in. below the ends.

How long is the warranty period for the heater?

The manufacturer provides a 12‑month warranty from the date of installation or 18 months from shipment, whichever expires first.

Download PDF (5.7 MB)