SMA Sunny Central 通风选件安装指南

安装指南用于SMA Sunny Central逆变器的化学活性物质防护通风选件,涵盖设备设置、挂载、布线和维护。


SMA Sunny Central 通风选件安装指南 - cover page
Brand
SMA
Document type
Installation Guide
Language
Chinese
Pages
5
File format
PDF
File size
291 KB
Published
02 November, 2026
Updated
02 November, 2026
MD5 checksum
11288358098767589C137A2F8A06BEE9

About this manual

本指南是Sunny Central安装指南的补充,专用于配备“化学活性物质防护”通风选件的设备。内容包括安装开关柜单元、用螺丝连接单元、连接电源线及控制电缆等步骤。适用于SC 400LV-11、SC 400HE-11、SC 500HE-11和SC 630HE-11型号。安装需遵循标准Sunny Central指南并使用提供的M8螺丝、垫圈等配件。 This manual is written in Chinese.

What's inside

  • 安装开关柜单元
  • 用螺丝连接开关柜单元
  • 连接电源线
  • 连接控制电缆

Frequently asked questions

What is the optional ventilation package for the Sunny Central inverter?

It is a chemical active substance protection package with a囊管结构 and air-to-air heat exchanger.

Which Sunny Central models does this manual apply to?

It applies to SC 400LV-11, SC 400HE-11, SC 500HE-11, and SC 630HE-11.

What screws are included in the optional ventilation package?

It includes 4 M8x45 screws (80-1380045).

Download PDF (291 KB)

More SMA Manuals


View all SMA manuals →