Sichuan Chuan Dian Electric Power Design Co., Ltd. CDSJ-YA-S230030-A0101-01 Permanent Power Distribution Engineering Des

Design specification for permanent power distribution system at Ya'an City Central Cash Processing Center, including equipment selection, metering…


Sichuan Chuan Dian Electric Power Design Co., Ltd. CDSJ-YA-S230030-A0101-01 Permanent Power Distribution Engineering Des - cover page
Brand
四川川电电力设计有限公司
Document type
Product Leaflet
Language
Chinese
Pages
27
File format
PDF
File size
17 MB
Published
06 November, 2026
Updated
06 November, 2026
MD5 checksum
1E7C0556447F46EC72914F4805100394

About this manual

This document outlines the design for the permanent power distribution system at Ya'an City Central Cash Processing Center. It covers design basis, project scope, equipment selection, metering methods, reactive power compensation, lightning protection, and grounding. The project includes two 500kVA SCB13 dry-type transformers and associated electrical components. The design is completed by Sichuan Chuan Dian Electric Power Design Co., Ltd. and includes detailed material lists and technical specifications for installation. This manual is written in Chinese.

What's inside

  • Design Basis
  • Project Overview
  • Design Content
  • Equipment Selection
  • Metering Method
  • Reactive Power Compensation
  • Lightning Protection and Grounding
  • Civil Construction

Specifications

Transformer TypeSCB13-500/10±5%/0.4kV, D,yn11
Transformer Capacity2 × 500kVA
Power Factor0.90 or higher
Grounding Resistance≤ 4Ω
Cable TypeYJV22-8.7/15kV 3×95 and 3×70

Frequently asked questions

What type of transformers are used in this project?

The project uses two 500kVA SCB13 dry-type transformers with D,yn11 connection.

What is the power factor after compensation?

The power factor after compensation is 0.90 or higher.

What is the grounding resistance requirement?

The grounding resistance must be ≤ 4Ω.

What is the metering method used?

The metering method is high-voltage metering (high supply, high metering) with a multifunctional electronic meter installed on the low-voltage side for reference.