ShoreMaster ShorePort PWC Lift instructions for the 58" x 138" Sandstone model, covering parts, keel roller adjustment, greasing, and dock attachment options.
This ShoreMaster ShorePort document is an owner’s manual for the 58" x 138" Sandstone PWC Lift. It begins with safety precautions and a parts list, then gives steps for installing keel rollers, installing the cleat, and attaching the ShorePort to a Poly Dock.
The manual also explains how to adjust front, middle, and rear keel rollers for different PWC designs, how to grease hard-to-turn rollers, and which connectors and brackets are used for ShorePort-to-Poly Dock, ShorePort-to-ShorePort, floating dock, and pipe anchoring setups.
| Model dimensions | 58 in x 138 in |
|---|---|
| Front height | 16 in |
| Freeboard without PWC | about 14 in |
| Optional float capacity | 50 lb capacity each |
| Pipe size | 2 in Schedule 40 pipe, 2-3/8 in O.D. |
Use a 7/32" hex key to remove the four 3/8" button head bolts, move the roller to the desired position, and reattach it with the same bolts.
Raising the front and middle rollers generally makes it easier to unload the PWC, though rollers that are too high may let the PWC slide off the ShorePort.
Add marine grade grease with a grease gun and snap-in needle; if the roller is still hard to turn, it is probably bent and will have to be replaced.
Torque the 5/16" x 4-1/2" connector rod bolts to 20 ft/lbs.