SFP Hydraulics 5000 PSI Top & Bottom Repairable Bladder Accumulators Precharge Maintenance Instructions

SFP Hydraulics instructions for precharging and maintaining 5000 PSI top and bottom repairable bladder accumulators, including nitrogen precharge pressures…


SFP Hydraulics 5000 PSI Top & Bottom Repairable Bladder Accumulators Precharge Maintenance Instructions - cover page
Brand
SFP Hydraulics
Category
Other products
Document type
User Manual
Language
English
Pages
2
File format
PDF
File size
750 KB
Published
23 November, 2026
Updated
23 November, 2026
MD5 checksum
0CA0993F05444A7FA520CEC3AED4B4BC

About this manual

This document gives precharge maintenance instructions for SFP Hydraulics 5000 PSI top and bottom repairable bladder accumulators. It recommends dry nitrogen for precharging, lists application-based precharge pressures, and describes lubrication, safety, and maintenance checks.

It also provides step-by-step charging and gauging procedures for bottom and top repairable accumulators, recommended accessories and part numbers, and recommended torque values after precharging.

What's inside

  • Recommended Accessories
  • Checking Precharge Pressure
  • Precharge Maintenance Instructions for 5000 PSI Top & Bottom Repairable Bladder Accumulators
  • Precharge Maintenance Instructions for 5000 PSI Bottom Repairable Bladder Accumulators
  • Precharge Maintenance Instructions for 5000 PSI Top Repairable Bladder Accumulators
  • Recommended torque values after precharging

Specifications

Rated accumulator pressure5000 PSI
Shipping precharge pressure25 psi (1.7 bar)
Minimum precharge relative to system pressure25% of maximum system operating pressure
Energy storage precharge90% of minimum system operating pressure
Shock absorption precharge60%-75% of normal working pressure
Pulsation dampening precharge60%-80% of normal working pressure
Minimum precharge to depress tank valve core80 psi
Lock nut torque after precharging240 Ft-Lbs +/- 10 Ft-Lbs
Jam nut torque after precharging50 Ft-Lbs +/- 5 Ft-Lbs

Frequently asked questions

What gas should be used to precharge the accumulator?

SFP Hydraulics recommends dry nitrogen and says not to use oxygen or shop air.

How often should precharge pressure be checked?

Check a new accumulator within the first week of operation, then at least every 6 months; high cycling or high temperature applications may need checks every 3 months or less.

What precharge pressure is recommended for energy storage?

For energy storage, the recommended precharge is 90% of the minimum system operating pressure.

Must hydraulic pressure be released before checking precharge pressure?

Yes, the hydraulic pressure must be released completely before checking precharge pressure.

Download PDF (750 KB)