SFP Hydraulics instructions for precharging and maintaining 5000 PSI top and bottom repairable bladder accumulators, including nitrogen precharge pressures…
This document gives precharge maintenance instructions for SFP Hydraulics 5000 PSI top and bottom repairable bladder accumulators. It recommends dry nitrogen for precharging, lists application-based precharge pressures, and describes lubrication, safety, and maintenance checks.
It also provides step-by-step charging and gauging procedures for bottom and top repairable accumulators, recommended accessories and part numbers, and recommended torque values after precharging.
| Rated accumulator pressure | 5000 PSI |
|---|---|
| Shipping precharge pressure | 25 psi (1.7 bar) |
| Minimum precharge relative to system pressure | 25% of maximum system operating pressure |
| Energy storage precharge | 90% of minimum system operating pressure |
| Shock absorption precharge | 60%-75% of normal working pressure |
| Pulsation dampening precharge | 60%-80% of normal working pressure |
| Minimum precharge to depress tank valve core | 80 psi |
| Lock nut torque after precharging | 240 Ft-Lbs +/- 10 Ft-Lbs |
| Jam nut torque after precharging | 50 Ft-Lbs +/- 5 Ft-Lbs |
SFP Hydraulics recommends dry nitrogen and says not to use oxygen or shop air.
Check a new accumulator within the first week of operation, then at least every 6 months; high cycling or high temperature applications may need checks every 3 months or less.
For energy storage, the recommended precharge is 90% of the minimum system operating pressure.
Yes, the hydraulic pressure must be released completely before checking precharge pressure.