Instruction sheet No. 412445 Rev. D for flaring Flexwell waveguide and assembling CPR or UG connectors, with tools and gasket selection.
This Radio Frequency Systems instruction sheet, No. 412445 Rev. D, describes how to flare Flexwell waveguide and assemble a waveguide connector. It lists the required hand tools and walks through disassembling the connector, cutting the waveguide, removing the jacket, fitting the heat shield boot, backnut, threaded gasket and insert plate, and trimming the waveguide with the plastic trim guide.
The sheet then covers flaring the waveguide over the insert plate with a ball peen hammer, attaching the connector body with screws and lockwashers, and shrinking the heat shrink boot for a weatherproof seal. A final note and table explain which gasket or O-ring to use for CPR and UG flange combinations, including the E185 gasket flats.
| Waveguide jacket removal length | 2-1/2 inches from the end |
|---|---|
| Final cut length with plastic trim guide | 3/16 inch |
| Longitudinal cut spacing | 1/8 to 1/4 inch apart |
| Gasket for CPR (G) to CPR (F) or pressure window without groove | Half Gasket |
The jacket is removed 2-1/2 inches from the end of the waveguide.
The cut should be 3/16 inch when the waveguide is trimmed flush to the plastic trim guide.
A half gasket is used for that flange combination.
Position the waveguide downward or put a clean cloth inside the waveguide just beyond the final cut point.