This installation manual covers the Q-Sox Lite-Trak Rail suspended fabric duct system from Q-Sox, a fabric duct air supply system company in Burnsville, Minnesota, USA. It describes pre-installation preparation, steel rail layout, splicing methods, suspension cable fixation, and required tools.
Installers must finish all building work and clean the air supply system before installation, using at least a 35% pre-filter. The manual explains how to assemble Lite-Trak rail segments with splice plates, hang the rail with Dyna-Tite cable locks, attach Q-Sox fabric duct sections, and wash and store the polyester duct. This manual is written in Chinese.
| Duct segment length | 10 feet to 22 feet |
|---|---|
| Hanger clip spacing | Every 7 feet |
| Suspension cable spacing | Every 6 to 8 feet |
| Turnbuckle suspension cable | 1/16 inch x 6 inch |
| Locating hole diameter | 0.172 inch |
| Max drying air temperature | 110 degrees Fahrenheit |
Pencil, chalk line, tape measure, power drill and bits, lead hammer, 1/16 inch wire rope cutter, level, and 5/16 inch nut driver or socket wrench.
Once or twice a year is recommended when using a 35% pre-filter.
The drying hot air temperature must not exceed 110 degrees Fahrenheit.
They are repeated every seven feet along the entire rail, with one set at each end of the duct.