Installation guide for NIBE VVM 225 internal module, covering setup, electrical and piping connections, safety, and troubleshooting.
This guide provides step-by-step instructions for installing the NIBE VVM 225 internal module, including handling, mounting, electrical and piping connections, and system commissioning. Safety precautions and component specifications are detailed. It also covers troubleshooting and service procedures for maintenance.
The guide is intended for qualified installers and includes diagrams, component lists, and technical specifications. Safety symbols and compliance information (CE marking) are included for user awareness. This manual is written in Dutch.
| System Pressure | 0.05 MPa (0.5 bar) to 0.3 MPa (3 bar) |
|---|---|
| Heating Medium Pressure | 0.01 MPa (0.1 bar) to 1.0 MPa (10 bar) |
| IP Rating | IPX1B |
The stated system pressure is minimum 0,05 MPa (0,5bar) and maximum 0,3 MPa (3bar).
Leave 800mm of free space in front of the product.
Leave 10–25mm of space between the VVM 225 and the wall behind it for cables and pipes.
The room must have a sewer drain (rioolafvoer).