Motor City Wash Works Bubble Arch and Foam Curtain Installation Manual

Installation and startup instructions for Motor City Wash Works Bubble Arch and Foam Curtain car wash equipment.


Motor City Wash Works Bubble Arch and Foam Curtain Installation Manual - cover page
Brand
Motor City Wash Works
Category
Other
Document type
Installation Guide
Language
English
Pages
20
File format
PDF
File size
798 KB
Published
05 November, 2026
Updated
05 November, 2026
MD5 checksum
17AB9783FA6E2D6427A6CD6D0F0E6350

About this manual

This manual provides installation instructions for the Bubble Arch (Part # FOAMBUBL000XXXX) and Foam Curtain (Part # FOAMCURT000XXXX) products. It covers equipment specifications, utility requirements, and safety symbols before detailing the assembly and mounting of the foam arch frame and head assembly.

What's inside

  • Equipment Specifications
  • Safety Symbols
  • Bubble Arch Installation
  • Utilities Installation
  • Electrical Runs
  • Starting-Up Your Bubble Arch
  • Foam Curtain Utilities Installation

Specifications

Electrical Supply115 VAC, 1 PH, 15AMPS
Full Load Amperage10AMPS (INCLUDING SIGN)
Pneumatics Requirement10 SCFM @ 100 PSI (MAX)
Fresh Water Requirement5 GPM @ 40 PSI (MAX)
Chemical Usage2 OUNCES PER CAR (AVERAGE)
Control OutputsONE FOR CONTROL PANEL (2)

Frequently asked questions

What tools are required for Bubble Arch installation?

Required tools include a measuring tape, hammer, drill with 1/2in wedge anchors, ball pen, hammer level, wrenches, assembly ladder, screwdrivers, and safety goggles.

What is the minimum height for mounting the dilution station?

The optional dilution station must be secured to a solid wall at least 40 inches above the floor.

What is the recommended chemical pump dilution ratio?

Set the pump dilution ratio to about 300:1 to ensure proper chemical concentration.

How do you verify the control box is ready?

Turn the CONTROL BOX BREAKERS ON and the ARCH OUTPUT FUNCTION ON; the READY LIGHT should turn ON.

Download PDF (798 KB)